
Add to Cart
Sale 3A Molecular Sieve
Recommended Application
1. Separation of enriched oxygen from air.
2. Production of medical or bulk oxygen in PSA units.
3. Removal of co2 and moisture from air (air pre-purification)and other gases.
4. Catalyst protection , removal of oxygenates from hydrocarbons(olefin streams)
5. Removal of mercaptans and hydrogen sulphide from hydrocarbon liquid streams such as LPG, butane, propane etc.
Property | Unit | Bead | Note | ||
Diameter | mm | 0.6-0.9 | 1.0-1.5 | 1.5-2.0 |
|
Static H2o Adsorption | %wt | ≥21.5 | ≥21.5 | ≥21.5 | RH75%,25℃ |
| %wt | ≥21 | ≥21 | ≥21 | RH75%,25℃ |
Bulk Density | g/ml | ≥0.75 | ≥0.75 | ≥0.75 | settled |
Crush Strength | N | ≥30 | ≥30 | ≥100 | Average |
Loss on Attrition | %wt | ≤0.1 | ≤0.1 | ≤0.1 | - |
The RSD of Crush strength | - | ≤0.3 | ≤0.3 | ≤0.3 | - |
Particle Ratio | % | ≥98 | ≥98 | ≥98 | - |
Package Moisture | %wt | ≤1.5 | ≤1.5 | ≤1.5 | 575℃,1hr |
Static CO2 adsorption | %wt | ≤3.0 | ≤3.0 | ≤3.0 | 0 ℃ |
Packing: 25kg /carton
Liaoning Alger Building Materials And Machine Co.,LTD locates in Bayuquan, Yingkou,Liaoning province, a beautiful coastal city. Alger was established in 2008. Alger is committed to produce and provide environmental energy-saving building materials and advanced intelligent efficiency machineries with better technical support and service. We own several subsidiaries to manufacture materials.
Q1: Can I have a sample?
A: Yes of couse, but you should pay the freight.
Q2: How do I get fast response?
A: Send the E-mail to us or call us directly.
Q3: What about the lead time?
A: Sample usually needs 5-7 days, mass production time needs 15-30 days
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping is also optional for big quantity.
Q5. How to proceed an order for your products?
a: Firstly let us know your requirements or needs.
b: Secondly We quote according to your requirements or our suggestions.
c: Thirdly customer confirms the samples and places deposit for formal order. Also you can get the testing if necessary.
d: Fourthly We arrange the production and ship to you.